COPYRIGHT©广州慧正云科技有限公司 www.hzeyun.com 粤ICP备18136962号 增值电信业务经营许可证:粤B2-20201000
New lab will cost approximately €25 million.
A first drawing shows the "slim part" of the new innovation and seminar complex (on the right) at BYK in Wesel. (Source: BYK)
BYK will be building a new laboratory building at its site in Wesel. BYK estimates a total project implementation period of around four years. Completion is envisaged in the second quarter of 2028.
“BYK is networked with its customers worldwide and, with this innovative laboratory complex, it will be creating space for effective communication as well as for developments and cooperation with our customers and distributors,” said BYK Division president Dr. Jörg Hinnerwisch.
In the planning, particular importance is being attached to efficient energy consumption. Heating and cooling, for instance, will be entirely fueled by heat pumps and photovoltaic systems. An old laboratory building will make way for a total area of 5,100 square meters so that it can be fully integrated into the existing structure at the BYK campus in Wesel.
慧乐居欢迎您关注中国家居产业,与我们一起共同讨论产业话题。
投稿报料及媒体合作
E-mail:luning@ibuychem.com